All 4,799 reports

NoTool not named · 8 Oct 2025

As a senior dev on a greenfield solo project it's too exhausting for me to have two parallel agents (front/back), most of the time they're waiting for me to spec, review or do acceptance test

senko on Hacker News

In the thread “Vibe engineering”, replying to this comment

Got in the way: Managing two parallel agents is exhausting and unsustainable.

… I wonder what the practical limits are. As a senior dev on a greenfield solo project it's too exhausting for me to have two parallel agents (front/back), most of the time they're waiting for me to spec, review or do acceptance test. Feels like sprinting, not something I could do day in and day out. …